| Roadway
Improvement
Project Description |
| Angeles Forest Highway- Los Angeles, CA |
| *Accelerated Road Construction Program |
| *Road Improvement Design-streets widening |
| *AC resurfacing |
| *Drainage system improvements |
|
|
| Pennsylvania Avenue- Los Angeles, CA
|
| *Accelerated Road Construction Program |
| *Streets widening |
| *AC resurfacing |
| *Drainage system improvements |
| |
| Ross Road- Memphis, TN |
| *Street improvements- along two (2) miles |
|
of a Major Collector Road |
| *Street widening- 48 ft paved roadway, two lanes of |
|
traffic in each direction, within 68 ft of right-of-way |
| *Drainage structures |
| *Striping-from
Winchester Road to southerly |
|
Memphis City Limits, near Pheasant Place |
| *Surveying |
| |
| |
| |
| |
| |
| |
| |
| |